DELFOSProfile · UX preview
DELFOS
Metallurgical performance control panelNear-real-time plant behavior with approximately one to two minutes of source latency.
Date / timeAug 8, 2026, 10:35 AM
Live · latest valid observation
Status gauge

Copper recovery

88.7%
Target
90% – 100%
Prior comparison
88.62%
Status gauge

Copper concentrate grade

27.2%
Target
26% – 29%
Prior comparison
27.2%
Status gauge

Copper in tailings

0.11%
Target
0% – 0.08%
Prior comparison
0.11%
Status gauge

Throughput

5,420 t/h
Target
5,300 t/h – 5,700 t/h
Prior comparison
5,418.96 t/h
Status gauge

Plant availability

94.8%
Target
95% – 100%
Prior comparison
94.74%
Key metric

Metallurgical health index

72Current authorized scope
High risk24-hour trend: ↓
6 rows

Primary recovery-loss drivers

VariableStatusImpactTrend
P80 grinding🔴High↑
Phyllosilicates🔴High↑
Rougher solids🟠Medium↑
Rougher pH🟠Medium↓
Aeration🟢Low→
Rougher Eh🟢Low→
Multi-series

Copper recovery evolution

10:3612:2714:1816:0918:0019:5121:4223:3301:2403:1505:0606:5708:4810:35
Copper recovery24-hour average
Combined measures

Copper losses by particle-size fraction

+212150–21275–15038–75−38
Copper in tailingsCopper in feed

Key operating variables

Status gauge

P80 grinding

247 µm
Target
170 µm – 190 µm
Prior comparison
247 µm
Status gauge

Phyllosilicates

17.8%
Target
0% – 10%
Prior comparison
17.8%
Status gauge

Rougher solids

38.1%
Target
34% – 36%
Prior comparison
38.1%
Status gauge

Rougher pH

9.25 pH
Target
9.5 pH – 10 pH
Prior comparison
9.25 pH
Status gauge

Rougher Eh

125 mV
Target
50 mV – 200 mV
Prior comparison
125 mV
Status gauge

Aeration

21,500 Nm³/h
Target
18,000 Nm³/h – 24,000 Nm³/h
Prior comparison
21,500 Nm³/h
Status gauge

Collector dosage

32 g/t
Target
25 g/t – 40 g/t
Prior comparison
32 g/t
Status gauge

Froth depth

32 cm
Target
25 cm – 35 cm
Prior comparison
32 cm
8 rows

Geology and feed · last 2 hours

indicatorvaluestatus
Feed copper grade1.15%🟠
Soluble copper0.68%🟠
Insoluble copper0.47%🟠
F80350 mm🟠
Total sulfur0.32%🟢
Total iron23.1%🟢
Hardness12.6 kWh/t🟠
OxidationLow🟢
4 rows

Process impact assessment

processstatusassessment
Grinding🔴Higher energy demand and inefficient classification.
Flotation🔴Poor liberation and slower flotation kinetics.
Thickening🟠Slower settling and higher flocculant demand.
Filtration🔴Lower permeability and higher cake moisture.
Process flow

Metallurgical balance · 24 hours

Copper recovery
88.7%
Copper lost
169 t Cu